125 Live!
Sat 6 +Sun 7 Sep
2025 is a milestone year for Perth Theatre and Concert Hall, with Perth Theatre turning 125 and Perth Concert Hall reaching 20. To celebrate these birthdays, we’re throwing a street party!
To celebrate 125 years of entertainment in the city, Perth Theatre and Concert Hall are throwing a street party for Perth.
125 Live! on Saturday 6 and Sunday 7 September 2025 will transform Mill Street into a musical and theatrical menagerie for a one-of-a-kind celebration of the performing arts and their place at the heart of the community.
Taking place across four live stages, stretching from Perth Concert Hall Plaza to Perth Theatre Courtyard, this theatrical performance will programme classical, contemporary, musical theatre and trad music stars alongside local groups, societies and community participants. Cutting-edge projections and special effects will envelop audiences by animating the surrounding buildings and structures, and the show will culminate in a dazzling audiovisual display.
There will be free drop-in daytime activities and theatrical performances for families, with food and drinks stands creating a true festival atmosphere in the heart of the city.
Iconic Glasgow glam-pop band Walt Disco leads the line-up for 125 Live! with further acts to include Skye trad and electronic duo Valtos, Perth indie band Parliamo, dynamic Perthshire piper Ross Ainslie with The Sanctuary Band and singer-songwriter and DJ Jack David.
They will be joined by spectacular big band That Swing Sensation, musical theatre stars Hannah Howie & Matthew Tomlinson and students from UHI Perth Musical Theatre course for a theatrical spectacular that runs from Perth Concert Hall Plaza to Perth Theatre Courtyard repeated over two nights.
(Beatles for Babies, taking place in Perth Theatre’s Joan Knight Studio during the daytime, is a participatory performance for 0-3s and their grown-ups. This is a separately ticketed event.)
Learn more about the acts performing at 125 Live! below:
The Glaswegian glam pop outfit WALT DISCO have been making waves in the European indie scene since their debut EP Young Hard and Handsome was released in September of 2020. Consisting of six members, three of whom are from Perth - James (lead singer); Finlay (guitar and keyboards); Lewis (guitarist); David (synth); Charlie (bass); and Jack (drums) - the group’s appearance is reminiscent of David Bowie, Marc Bolan, and mid-1970s Brian Eno with a dash of ABBA thrown in for good measure. Yet Walt Disco somehow remains totally unlike any other band that has gone before them – they have a distinctly 21st-century feel, a fervent embrace of unapologetic self-expression and decadence. The band have quickly forged their own signature sound, inviting listeners into a colourful realm of rock n’ roll that Dork Magazine has dubbed, 'Walt Discoworld.'
125 Live! will be their Perth debut.
VALTOS, comprised of Skye natives Daniel Docherty and Martyn MacDonald, have taken the Trad and Electronic music worlds by storm. Since their debut shows in December 2021, they have captivated audiences at festivals and sold-out venues nationwide. Their music has been described by Folk Radio UK as 'like nothing you've heard before', blending influences from electronic and folk music. Inspired by artists like Martyn Bennet, Peatbog Faeries, Odesza, Madeon, and Bicep, Valtos creates a unique and genre-defying sound.
125 Live! will be their Perth debut.
Already being hailed as one of Scotland’s most exciting young prospects, local Perth band PARLIAMO, takes inspiration from the laid-back electronica-infused indie pioneered by the likes of Primal Scream, Super Furry Animals and Blur. Their debut EP, The Parliamo Manifesto, released in 2021, saw the band employ a tongue-in-cheek approach to some of the darker aspects of life faced by young people and marked them out as a major emerging talent to watch. Turning heads with their self-proclaimed brand of 'underground pop', the band have since attracted praise from the likes of Clash Magazine, BBC Radio 1, 6 Music, Radio Scotland, Radio X, KEXP and more.
Parliamo last played the Joan Knight Studio in 2022
Born in Perthshire in 1983, ROSS AINSLIE began his career as a member of the Perth and District Pipe Band, before joining the Vale of Atholl Pipe Band, where piper Gordon Duncan mentored him. Hugely influenced by Gordon’s fearlessly innovative spirit and groundbreaking compositions, Ross began exploring his own abilities as a composer and writing his own tunes, and in 2002 he was a finalist in the prestigious BBC Radio Scotland Young Traditional Musician of the Year competition. Ross has six solo albums to date; Wide Open in 2013, Remembering in 2015, Sanctuary in 2017, Vana in 2020, Live in the Gorbals in 2022 and Pool in 2024.
Through the Gordon Duncan Memorial Trust, Perth Concert Hall ran the Gordon Duncan Experience from 2011 – 2023, providing young people aged 11-25 from Perthshire and further afield opportunities to perform Scottish Traditional music as part of a large group and participate in an annual concert held in the venue.
Ross Ainslie has most recently performed in Perth Theatre in early 2025. He also performed during the opening of perth Concert Hall in 2005.
JACK DAVID is a Scottish DJ, producer, and songwriter. His sound combines infectious melodies with slick production. Bringing the summer vibes to soundtrack the good times. Amsterdam Dance Event 2024 saw the launch of Jack David as a live act, already sharing lineups with International DJs such as Sam Felt, Laidback Luke, FASTBOY, Martin Jensen, Bassjackers and more. Jack has spent the last four years working behind the scenes as a songwriter, producer, and instrumentalist for other artists such as Timmy Trumpet, Marc Benjamin, Nick Schilder, Sub Zero Project and many others, as well as releasing under his deep house alias Able Faces which currently has over 750,000 monthly listeners on Spotify. Jack’s songs have accumulated over 200 million streams so far. Long before Jack decided to become a fully-fledged performing artist under this name, Jack David started as a passion project, and as an outlet to showcase Jack’s love for feel-good music. After the success of his singles Lost in The Night, a collaboration with Thierry Von Der Warth, and Lost in Love (feat. Rolipso), it became clear that following the sounds that you find most exciting is always the best way to go. Jack will release a new EP in August of this year.
125 Live! will be his Scottish debut.
HANNAH HOWIE is a singer who hails from Scotland. She has toured the seven seas, entertaining the masses in her own shows with her ability to make audiences laugh and cry for all the best reasons. Her voice is all about variety - from Musical Theatre to Pop and Rock, Scottish Folk music to Operatic arias, Hannah does it all with aplomb showcasing her huge vocal range and fantastic wit in all 3 of her shows. Most recently, she also supported Michael Ball MBE onstage, and over the last decade has performed in theatres throughout the UK in musicals and plays.
MATTHEW TOMLINSON is an experienced vocalist who has won major prizes in festivals throughout Scotland, including Arbroath, Aberdeen, Kirriemuir, Montrose, Dundee and Glasgow. He has appeared in musicals throughout Scotland and is the keyboard player/vocalist in pop/rock band Peyton Place, which, since its' formation in mid-2010 has released a successful E.P., a single, played on various radio stations and built a successful fan base throughout Scotland.
125 Live! will be their Perth debut.
ALBA CORRAL is a Catalonian visual artist and creative coder living in Barcelona who has been creating generative art using software and coding for the past decade. Corral is known for her stunning live audio-visual performances, where she integrates real-time coding and drawing in collaboration with musicians.
This will be the first time Alba has had the opportunity to present outdoor work outside of Spain, with previous locations including Casa Navàs, Reus; Llum BCN, Barcelona; Plaza de la Independencia, Madrid and Tabakalera, San Sebastián.
WILL POTTS is an award-winning Creative Director, Stage Designer and Lighting Designer. Since 2006, Will has worked in creative roles with a wide variety of artists in different genres of performance - from contemporary performance art, theatre and dance, large-scale corporate events, through to live broadcasts, arena-size concerts and global touring.
Will won a Knight of Illumination Award for his design work with the critically acclaimed electronic act Disclosure in 2014 and won the award a second time for his work with singer Sam Smith in 2015. Other notable collaborations include pop music artists: Bat for Lashes, Dylan, George Ezra, Honne, Joesef and Rag N Bone Man; electronic music artists: Actress, AG Cook, Carl Cox, Dusky, Max Cooper, Brian Eno, Magnetic Man, Hudson Mohawke + TNGHT, Oneohtrix Point Never, Optimo, Joy Orbison, PC Music and Rival Consoles; brands: Chanel, ESC Racing, Gucci and Red Bull; and broadcast: American Music Awards, The BBC Music Awards, Brit Awards, Deezer Sessions, The Graham Norton Show, The Jonathan Ross Show, The Late Show – James Corden, Saturday Night Live, Sounds Like Friday Night and The Tonight Show – Jimmy Fallon.
The Scottish big band THAT SWING SENSATION has been entertaining audiences throughout Scotland and the North of England with its enthusiastic mix of swing and big band music since its formation in 2007. The band is also well-known for its big band stage shows and has enjoyed several appearances on radio and television and in the Guinness Book of World Records.
Younger audiences can enjoy a programme of free daytime activities, shows and workshops, plus theatrical performances from a range of local and community acts on our Gig On A Truck and Mill Street stages.
Your littlest ones can explore a world of music, light and play in the Soundplay Dome in Perth Concert Hall, sing along to Beatles for Babies*, La Petita Malumaluga’s charming interactive tribute to the Fab Four and party on at interactive music gig Sprog Rock. Magician Patrick Ashe will entertain and amaze with his mesmerising tricks, VR headset tours will take you behind the scenes in Perth Theatre and Concert Hall and Surge Community Theatre will be joined by members of Perth Youth Theatre in a show that promenades the length of Mill Street.
Saturday performances on the Mill Street and Gig On A Truck stages include The Apologetics, The Crom, Bohemian Monk Machine, Tayside Big Band, Perth Concert Hall Voices and Carse Voices.
Sunday performances on the Mill Street and Gig On A Truck stages include Perthshire Brass, Mad Ferret Band, Blackford Fiddle Group and Perth Youth Musical Theatre.
*Beatles for Babies tickets £8 (1 adult + 1 baby)
Perth's newest and hottest indie folk/rock band, The Apologetics will take to the music stage at 125 Live!. These UHI graduates met while they were studying, and like they say - the rest is history!
A firm favourite in Perth Theatre’s Joan Knight Studio, the 6-piece funk band hailing from Perth, Bohemian Monk Machine, are here for the high energy funk mania! Expect groove based original material and an array of covers and reworks ranging from the 60’s era of James Brown right through to the current sounds of Vulfpeck. They are performing at Belladrum Festival and are about to release their new EP.
Award-winning indie band The Crom released debut album Right On Cue in 2021, which would go on to be nominated for the SAY award (Scottish Album of the Year) 2022. Their highly anticipated second album, Evolution was released on in May 2024. Recognised by the music industry as an emerging talent, winning ‘Best Indie Rock Act’ at the Radio WigWam awards and ‘Best Indie Act’ at the Lowlands Music Awards in 2023 - The Crom are on their way…
Tayside Big Band is a 20 piece Jazz band playing a range of swing, classic jazz and contemporary pieces.
Prepared to be amazed as Patrick Ashe (as seen on Britain’s Got Talent) entertains and impresses with his engaging style and mesmerising tricks.
The Fair City Singers is an independent and highly successful choir for 9- to 18-year-olds living throughout Perthshire, Scotland. The choir is well renowned across the central belt of Scotland and recognised locally for its strong musical tradition and high-performance standards.
Welcoming all singers, from beginners to experienced professionals Perth Concert Hall Voices is a group of like-minded people, all with a mutual love of music, who perform an uplifting and varied selection of songs. Carse and Leven Voices are community singing groups based in Errol and Kinross, which have been running for 10 years. This is the first time that all three groups have come together to perform and share in the collective joy of singing and music.
Perthshire Brass is a community brass band offering opportunities for young people to continue their music making beyond the school provision, making brass banding a hobby for life. Both the main band and their youth division will perform at 125 Live!.
Mad Ferret Band, a high energy folk duo from Perth, are known for their lively blend of traditional and contemporary folk music. With blisteringly fast mandolin solos, tight vocal harmonies, driving Cajun beats, and earth-moving guitar sounds, you're guaranteed a dance!
The Blackford Fiddle Group (BFG) is a community music group with members of all ages and abilities. As well as offering a supportive environment where everyone can learn at their own pace. BFG also provides opportunities to perform at ceilidhs, concerts, and other events.
Sprog Rock is a live interactive music gig for all ages - especially 0-5 year olds. We love to party!
Come along to one of the fun and creative workshops with Ella Mackay from Nudge Puppets, where you can create and see your own puppet come to life!
Working with our experienced creative leads, the young singers and performers of Perth Youth Musical Theatre develop a repertoire of songs, choreography and scenes to showcase on Perth Theatre's main stage and at other events in the city.
The Soundplay Dome is an immersive, interactive space where music, light, and play come together for people of all abilities. Step inside and explore a world of sound through movement and touch, with responsive animation and audio creating a unique sensory experience.
Four fab musicians on the move (violin, saxophone, cello and percussion) and a dancer perform a warm and welcoming tribute to The Beatles in Beatles for Babies*. Little ones who love to explore can move freely around the stage and interact with the band making every performance totally unique to the audience in the room.
Every street’s a stage for Surge Community Street Theatre! Their performers will be joined by members of Perth Youth Theatre in a show that promenades the length of Mill Street.
Neon Eight’s VR Theatre - Take a virtual reality tour of Perth Theatre and Perth Concert Hall in the company of our Youth Ambassadors with immersive video specialists Neon Eight.
Schools Installation - Cardboard Perth! What does Perth mean to you? This is what we are asking local Primary schools as they create an installation made completely of cardboard. Through craft and storytelling workshops, they will be creating their own model box and story which will be displayed in Perth Theatre. Want to have a go yourself? Children and families can also drop in over the weekend to take part in art workshops where you can create your own design there and then and add to the installation.
*Book here for Beatles for Babies tickets £8 (1 adult + 1 baby)
Learn more about the masterminds behind 125 Live!
Conceived and produced by Christopher Glasgow
Director Christopher Glasgow joined Perth Theatre and Concert Hall in 2021 and took up his current post in 2023, leading the artistic vision and delivery across both venues, as well as touring projects regionally and nationally. He is also a Trustee of Drake Music Scotland and PLUS Perth & Kinross, a member of The Grey Hill’s Creative Catalyst Advisory Board and sits on the industry review panel for the Royal Conservatoire of Scotland’s MA Arts Leadership & Fundraising and MA Creative Arts Practice.
Creative Director Cathie Boyd
CATHIE BOYD is an internationally respected director, producer and curator known for her ability to inspire others and her strong leadership of creative endeavour. With over 30 years of experience, she is able to work across art forms, from opera to music, digital arts and film, while being able to work at a strategic and practical level, often in new and unusual ways to achieve goals.
Raised in Belfast, Cathie graduated from the Royal Conservatoire of Scotland and set up Cryptic in 1994 with the desire to create innovative music and/or sound-based performances that would ‘ravish the senses’ of international audiences. Her many years of artistic practice include numerous international commissions and collaborations, which have been presented in over 30 countries.
Cathie has been instrumental in providing a key platform for artists around the world by creating Glasgow’s biennial Sonica Festival in 2012. She also has much experience in working with new technologies and was previously awarded a NESTA Fellowship to develop live visuals for classical music – performances include the Baltimore Symphony Orchestra, BBS SSO, London Sinfonietta and NYO.
Awards include International Citation of Merit (from ISPA); Creative Programming for Sonica; NESTA Fellowship; European Woman of Achievement for the Arts; Outstanding Young Person Award; Junior Chambers of Commerce and an Edinburgh Festival Fringe First. Cathie also served as President on the Board of IETM (international network for contemporary performing arts) and Vice Chair at Visiting Arts, London. She recently participated in the Performing Arts Research metaLAB with Harvard University.
Musical Director Hilary Brooks
Glasgow-based HILARY BROOKS is a multi-award-winning musical director whose work includes Mr Moonlight, Cranhill Carmen, Doris, Dolly & The Dressing-room Divas, The Last Picture Show and the post-lockdown film Play On. Hilary was the original musical director and arranger of Sunshine on Leith for Dundee Rep and UK tours and Glasgow Girls, winner of the Amnesty International Freedom of Expression Award. Hilary was Musical Director on the world première of John Byrne’s Underwood Lane at The Tron, Glasgow and has collaborated with Clive King on A Play, A Pie and A Pint shows, Meeting Matthew, Melania and Wee Free! The Musical. Most recently, she was the sound designer on the 2023 Perth Theatre co-production of Tally’s Blood with the Ayr Gaiety and Cumbernauld Theatre Company, musical director on the 2024 Perth Theatre production Casablanca: The Gin Joint Cut and continued her run with our première of Restless Natives in May.
Choreographer Chris Stuart Wilson
CHRIS STUART WILSON has worked as a choreographer for many theatre companies, including Perth Theatre’s annual pantomime. He has also performed twice in the Joan Knight Studio as his international award-nominated alter-ego, Jesus L’Oreal and continued his run with our première of Restless Natives in May. In addition to choreography, his entrepreneurial portfolio involves directing, performing, hosting events, and facilitating dance for vulnerable and marginalised groups, including people with dementia and LGBTQIA+ elders.
We believe that culture belongs to everyone. If you’re in the position to pay it forward, please consider adding a donation to our Ticket Bank to cover someone else’s ticket to 125 Live!, our celebratory street party for Perth. We’re working with Perth Citizens Advice Bureau (CAB) to ensure that your donated tickets go to those who need it most.
Click below to find out more!
Support us as we celebrate 125 years of entertainment in Perth! We are planning a year of celebrations to mark our venues' special birthdays and every donation helps! You can even become a member of our 125 Club and enjoy a range of exclusive benefits if you donate £125. If you'd like to become a patron for even more benefits, please contact our development team directly at development@perththeatreandconcerthall.com
Daytime and family events
Sat 6 Sep: 12:00 – 16:00
Sun 7 Sep: 12:00 – 16:00
Evening performance
Sat 6 Sep: 18:00 (doors) – 22:30 approx
Sun 7 Sep: 18:00 (doors) – 22:30 approx
125 Live! daytime and family events take place on Mill Street, Perth, in Perth Theatre and Concert Hall and our pop-up stage Gig On A Truck* will be on King Edward Street.
The evening performances take place on Mill Street, progressing across three stages from Perth Concert Hall Plaza to Perth Theatre Courtyard.
Entrance to the site will be via Perth Concert Hall and the Perth Concert Hall Plaza.
For more details on how to get here, please see our travel page.
*Gig On A Truck is proudly supported by St Johnstone FC
For the evening performances, anyone under the age of 18 must be accompanied by a responsible adult aged 21 or over (maximum of two under 18s per adult 21+).
Daytime family events are free, excluding Beatles For Babies in Perth Theatre’s Joan Knight Studio, which is priced at £8 for 1 baby + adult – follow the link to book.
We recommend buying tickets for the evening performances in advance to secure your space. Subject to availability, there will be tickets available to purchase on entry.
There is open access to the site for the daytime activities.
Your hand will be stamped on entry so that you can leave and come back during the evening performances.
You cannot bring food or drink into the site.
There will be a wide variety of food and drink available to purchase, catering to all requirements.
Yes, water points will be available by all of our bars and signposted throughout the site. You may bring in an empty bottle (plastic, not metal) to the site to refill.
The 125 Live! evening performances progress from stage to stage with the audiences following on foot. You are welcome to bring a camping chair, but please be aware that this may affect your ability to see the acts on stage.
Yes, prams are welcome at the site. We cannot accept liability for prams if left unattended.
Yes, you may bring a bag up to an A3 size. Please arrive in plenty time as bag checks will be in operation.
With the exception of special assistance dogs**, no animals are permitted at the evening event.
**Please be aware that there will be loud noises and lighting effects
This is an outdoor event. Please ensure that you prepare for all weather eventualities. In the event of extreme weather conditions, performances may be moved indoors.
Please see here for our Terms & Conditions.
As per terms & conditions agreed when purchasing your tickets, tickets are non-refundable and non-transferable. See Terms & Conditions for further information.
For press enquiries please contact us here.
No worries, please just contact us and we’ll do our best to assist you.
The Mill Street site is fully accessible and there are accessible toilet facilities in both venues. 125 Live! is a standing event, but you are welcome to bring a foldable chair. If you would like to talk about particular access requirements, please contact ticketing@perththeatreandconcerthall.com.
A limited quantity of ear defenders will be available.
There are accessible toilets in both venues.
We have a medical area on the site – if at any point you require some privacy or assistance, please just speak to a member of our staff.
For your information, protection, and the comfort of all customers, Perth Theatre and Concert Hall reserves the right to refuse admission in reasonable circumstances including for health and safety, licensing reasons or aggressive behaviour.
Anyone obviously under the influence of alcohol or drugs may be asked to leave the site.
• Alcohol
• Aerosols
• Air Horns
• Flares
• Cans
• Large chains/spiked jewellery
• Glass
• Marker Pens or Paint
• Laser Pens
• Gas canisters
• Drones
• Chinese lanterns
• Anything illegal
• Fireworks
• Knifes or other weapons
• Nitrous Oxide